路沿石模具生产工艺流程介绍
发布人:管理员   发布时间:2020-6-30

路沿石模具生产工艺流程介绍将水泥和其他灰渣等材料按照一定的比例称重后倒入到水泥搅拌机当中,通过专人操作后将制作好的混凝土放入车中运输到预制厂场地。

The cement and other materials such as ash and other materials will be weighed according to a certain proportion and then poured into the cement mixer. After being operated by a special person, the prepared concrete will be put into the vehicle and transported to the prefabrication plant site.


路沿石模具平整摆放好在预制厂地上,在模具的内壁均匀涂刷好废机油。刷好废机油以后将混凝土平稳的浇筑在模具当中,同时使用震动平台对模具进行震动以此来保证模具内不会有空气。

The molds of curbstone shall be placed on the floor of the prefabrication plant, and the waste engine oil shall be evenly applied on the inner wall of the mould. After brushing the waste oil, the concrete is poured into the mold stably. At the same time, the vibration platform is used to vibrate the mold to ensure that there is no air in the mold.

 

              


正常的路沿石模具需要抹平上层面,等到混凝土初期凝固后就要及时洒水,并且等待十二小时后就可脱模。脱模方法很简单,将模具反面扣在地上即可完成脱模。

The normal road edge stone mold needs to be troweled on the upper layer. When the concrete is initially set, it should be watered in time, and it can be demoulded after 12 hours. The demoulding method is very simple, and the demoulding can be completed by fastening the reverse side of the mold on the ground.


.养生:脱模后的水泥路沿石至少需要一个星期到十天的洒水养生才能正常使用。


. curing: after demoulding, the cement curbs need to be watered for at least one week to ten days for normal use.

路沿石模具的运输和安装:路沿石容易损坏在运输的过程中需要轻装轻放,车速不易过快。安装时需要先确定位置和高度,并进行放样准备,这样可以保证路沿石安装的质量和路面整体的良好外观效果

Transportation and installation of curb stones: the curbstones are easy to be damaged. In the process of transportation, they need to be handled with care, and the speed is not easy to be too fast. During installation, the position and height shall be determined first, and the lofting preparation shall be carried out, so as to ensure the quality of the installation of the curbstone and the overall good appearance of the pavement